CATHODIC PROTECTION TECHNOLOGY

Search SELEC

When you submit an enquiry, we use your details to respond. Privacy and cookies ↗

Explore all products ↗

MARINE TECHNICAL GUIDE

Shaft and rudder earthing

Electrical continuity, installation and system monitoring.

THE CURRENT PATH

What effective shaft earthing changes.

RISK TO THE SHAFT LINE

Without shaft earthing

The lubricating film and non-metallic bearings can insulate the shaft from the hull. Potential differences can drive current through bearings, creating a risk of electrical erosion.

Possible path through bearings

CONTROLLED CONNECTION

With shaft earthing

Brushes maintain slip-ring contact during rotation. The connection provides a low-resistance path to the hull, integrates the shaft line into protection and reduces the risk of bearing currents.

Path through the hull connection

Conceptual stern view highlighting the electrical path between propeller, shaft and hull. This is not an installation drawing or the complete cathodic protection circuit.

THE SHAFT EARTHING ASSEMBLY

Components that maintain continuity.

Copper slip rings with silver track for shaft earthing

Slip rings

Rotate with the shaft and provide the brush contact surface. We supply copper rings with silver tracks and custom-machined bronze rings. Diameter and track width are selected for the mounting arrangement and current capacity.

Double-arm shaft earthing brush holder

Brush holders

Support the brushes and maintain pressure against the ring. Articulated or fixed double-arm assemblies allow contact adjustment; their support must maintain alignment during operation.

Silver-graphite brushes with flexible leads

Silver-graphite brushes

Provide sliding contact between the ring and hull connection. Brush composition, cross-section and quantity are selected to balance conductivity, current capacity and wear resistance.

SELEC INSTRUMENTATION

Monitoring to support timely maintenance.

A high potential difference may indicate loss of contact due to worn brushes, a dirty track or poor connections. The alarm signals the need to inspect the assembly and consider cleaning, adjustment or brush replacement to restore continuity and reduce corrosion risk.

The SELEC instrument measures shaft-earthing potential difference and current, with local LCD readings and current measurement through a shunt. The alarm activates when the magnitude of the potential difference reaches 100 mV for 2 seconds, indicating that the electrical connection should be checked.

Potential differenceMonitoring the electrical connection.
System currentMeasurement during operation.
Potential alarm100 mV threshold with a 2-second delay.

The connection, component by component.

Shaft and bronze ring cross-section with brushes and shunt-based monitoring The shaft is shown as a circle surrounded by the bronze ring. Brushes contact at the eleven and one o'clock positions: measurement on the left and earthing on the right. The measurement brush connects to the instrument. The earthing brush connects to the hull through the shunt, whose ends connect to the instrument by straight measurement lines. SHAFT CROSS-SECTION Shaft Bronze ring Brush formeasurement Brush forearthing Shunt Hull SELEC instrument Potential · Current

Blue: potential · Orange: earthing · Purple: shunt measurement.

Select a component to explore its role.

Shaft and bronze ring

The bronze ring rotates with the shaft and provides a contact surface for the brushes. This cross-section shows the shaft in the centre and the bronze ring around it.

INSTALLATION AND MAINTENANCE

Electrical contact must be maintained during rotation.

A poor connection can leave the shaft line outside the intended cathodic protection control and allow damaging current to flow through unintended paths, including bearings.

Mounting and sizing

Shaft geometry, assembly position, current and maintenance access are assessed. The hull connection must provide a low-resistance path; ring, brushes and conductors are sized as an assembly. A connection intended for the propulsion system is not considered adequate for cathodic protection without checking its location and current-carrying capacity.

Independent measurement

An additional brush measures shaft-to-hull potential through a contact independent of the brushes carrying earthing current. This separates the protection connection from the measurement pickup. Tracks and brush holders are arranged for each assembly.

Periodic inspection

Track cleanliness, brush wear, contact pressure and connections are checked. Potential measurements during operation help detect deviations and guide maintenance.

Rudder-blade electrical continuity is designed according to construction and movement; the shaft's ring-and-brush arrangement is not automatically applicable.

← All marine technical guides